Product Details:
Payment & Shipping Terms:
|
Feature: | Corrosion Resistant | Electric Current Type: | AC |
---|---|---|---|
Material: | Stainless Steel | Voltage: | 220v,380v,420v |
Mounting: | Free Standing | Phase: | 3-phase |
High Light: | double inlet centrifugal fan,direct driven centrifugal fan |
Industrial Flue Gas Desulfurization Centrifugal Fan Corrosion Resistant Materials
This series of centrifugal fan has high efficiency, low noise and stable performance curve. The whole is made of corrosion-resistant stainless steel. Generally used to transport corrosive gases, used in chemical industry and industrial desulfurization equipment.
Industrial Flue Gas Desulfurization Centrifugal Fan Corrosion Resistant Materials |
|||
Centrifugal fan | Air Flow | 8000~50000 | m3/h |
Pressure | 900~3400 | Pa | |
Rotating speed | 2900/1450/960/730 | r/min | |
Material | Carbon steel | ||
Motor | Power | 4~55 | kw |
Voltage | 220/380/440/6000/6600 | v | |
Frequency | 50/60 | hz |
Our company produces various types of centrifugal fan, axial fan, roof fan, oblique flow fan, exhaust fan, tunnel fan, ball-type hood, wind chassis, and other products.
Feature: high efficiency, low noise, low energy consumption, durable anti-corrosion and easy maintenance.
Widely used in hotel, office building, market, laboratory, hospital, exhibition ventilation system, tunnels, thermal power plants, factories and other buildings.
Excellent high temperature performance: Fan tested in accordance with GB-T13274-91 test free code standards.
Wide range of applications: According to the different requirements of senior civil
construction, the use of variable speed or multi-speed drive mode.
Energy efficient: use advanced CAD software series, by the multi-objective optimization design research and development of new products.
Centrifugal fan production process:
Case Show:
FAQ
Q1: What parameters need to be provided when you design the industrial centrifugal fans?
A: Air flow, total pressure or static pressure, voltage, working condition.
Q2: What is the lead time after placing the order?
A: Normally, it takes about 1-2 weeks after your order. However, it would depend on our production line schedule and the complexity of the item.
Engineering is about 3 Months after receiving your confirmation.
Q3: Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q4: What is the delivery term for making business?
A: In general, we send the shipment in FOB term. However, the terms of CIF and C&F are acceptable which depends on the preference of the client.
Contact Person: DAJING FAN